Clifford G. Martin, P.E., Assoc. AIA

Representative Surveying Projects

Abaxial personnel perform surveys in normal conditions and in hazardous environments (projects that require OSHA 40-hour HAZWOPER certification).  Clifford Martin has had significant surveying experience on the following representative projects.

Construction Support Surveys

Greater Mt. Zion Baptist Church

This project initiated as a support for the design of a new church to replace the church that was destroyed by fire. The new building required complying with current zoning and land-use ordinances.

Researched historical records in a portion of the original town where the reference plat had been lost from the County Courthouse. Used this research to accurately locate property boundaries that had been mis-located by two previous surveyors.

Back to Clifford Martin's Representative Projects Index

 

Cargill Flour, Fort Worth, Texas

This project was initiated to determine the cause of flow measurement malfunctions. The investigation led to a redesign of the flow measurement and the rehabilitation of plant sewer lines. The final task was to measure the as-built facilities as a quality control to ensure that the new facility would function properly.

Back to Clifford Martin's Representative Projects Index